Internal works comprised new floor coverings and joinery and repairs to ceilings and walls including decorative plasterwork detailing. Built between 1776 and 1781, the property retains much of the interior plasterwork typical of the period; this called for a sensitive approach throughout the works.
M&E upgrades included the refurbishment of the existing lift car, installation of a new comfort cooling system and new lighting throughout including feature chandeliers. New toilets, a kitchen and a shower room were installed in the basement.
Externally the existing slated roof slopes were overhauled and repairs were made to lead flashings, brick parapets, chimney stacks and joinery. Stabilisation, re-pointing and general cleaning were also provided to some areas of brickwork on the building’s south facing façade which fronts the splendid Georgian Bedford Square.
Our client was thrilled with the end result as was the new tenant upon occupation of the offices.
Client
The Bedford Estates
Consultants
Tuffin Ferraby Taylor – Contract Administrator
Mason Navarro Pledge – Structural Engineer
Taylor Project Services LLP – Services Engineer
Contract value
£750k
Contract period
20 weeks
Location
26/27 Bedford Square, London WC1